Carbon fiber new material high-end e事可quipment Contact num跳物ber:0575-84886688

JingCloud 600 series


JingCloud 600 series o來光f integrated cabinets are deep吧答ly integrated with distribution modul技黃e, rack UPS, batte靜愛ry system, rack a嗎車ir conditioning, monit分師oring module, emergency air conditio廠鄉ning system and 答購other components, providi綠廠ng reliable distribution s務村ystem, operating envi計站ronment for IT equipment and realizin山樹g real-time monitoring and managemen視數t of the whole system. The cab們我inet is the computer room; a房音ll components are pre-fabricated, pre-關飛installed, and field installati窗腦on is simple and feasible. Rapid dep路西loyment, flexible produ物機ct configuration, to meet the rapid inc線票rease in user networks, transformation頻票 of information construction needs地草.

1、introduction

JingCloud 600 s線器eries of integrated cabinets are deeply們遠 integrated with distribution m年工odule, rack UPS, b高算attery system, rack air c上一onditioning, monitoring module, emer媽訊gency air conditioning system a地一nd other components, providing reliab計在le distribution system, operating e公城nvironment for IT e資亮quipment and realizing real-tim照秒e monitoring an兒樹d management of the whole system. 森化The cabinet is the computer r是好oom; all components are pre-fab飛靜ricated, pre-insta是拿lled, and field installation is sim月件ple and feasible. Rapid deployment, fle不美xible product configur也美ation, to meet the rapi厭喝d increase in user腦頻 networks, transform你黑ation of information construction 人輛needs.


2、Product applic業拍ation scenario

1567477501591618.png


3、Product characteristics

It integrates refrigerat西電ion, distribution and mon間請itoring, separates strong 術城and weak currents, and has high relia機又bility and fault-tolerant design.The co畫計ld and hot passage is completely cl器我osed, effectively isolating the cold an拍電d hot air flow, high e朋視fficiency and energy saving, leading 樹城PUE industry;Modular and flexible conf子制iguration, rapid expansion, 慢村rapid response to changes in business n窗村eeds, that is, ready-to-use;One村呢 hour installation, ef畫業ficient and convenient deli司公very, one-stop service, after-費黃sales worry-free;Real-time monitorin暗可g system operating parameters, mobile腦藍 phone operation and maintenanc雜工e, to achieve unattended.

Project

Description

 Parameter

Overall   parameter

Power   system

220/230/240/Vac50/60Hz1Ph+N+PE

Operating   temperature

0 - 35

Humidity   range

5 – 95   %

Altitude

0-1000m

Cabinet   system

SizeW*D*Hmm

600*1200*2000

Front   door

Glass   sea鐘區ling

Back   door睡睡

Sheet   metal seal

U bit   space也商

Maximum   ava多線ilable

≤26U

Distribution   System

Power   distribution modu拍放le

Input   powe動雨r

Dual    220/230/240/Vac50/60Hz

Input   main swi金城tch

63A

Output   loop

4*16A/1P

Lightning   prote呢國ction level

Class   C lightning protection

Installation   method

Rack   type

UPS

Capacity

6kVA

Backup   time

5 - 120min

Installation   method

Rack   type

PDU

Configuration

12*16ANational   standard (2)

Installation   method

Vertical   installation

Air   conditionin不信g system

Cooling   System

Air    con你少ditioning  capacity

2.5KW/3.5KW

Sensible   heat一水 ratio

1

Air   volume

500/m³/h

Air   supply m秒老ethod

Front   air supply, rear return ai內懂r

(integrated   air cond子水itioner)

surveillance &nb拍白sp; system

Local   inte城你rface

10   inch lar外道ge screen display

Monitoring   市也; content

Smoke,   temperature and humidity,體務 water leakage, UPS, air conditio生月ning

Door   control

Refrigeration  輛睡 failure emergency projecti說市le door design

IT   equipment業書 monitoring

Support


Recommend to you